News

Steel racking

Update 3/22/2012
Steel racking

Handover racking system for Dai Thanh Dat Company

On 03/03/2012, Viet Mechanical and Dai Thanh Dat proceeded to handover racking system. This system is produced and complete assembled in 25 days.

System includes:

- Shelving system, 8 tier, powder coating.

- Mezzanine floor, powder coating.

- Shelving on the mezzanine floor.

- Electric system on the floor.

- Strengthening system for weak foundation.

Other news